phoenix/2011SMALLNEW100DPIFullLogo.jpg

HOME | MODELS - FLOOR PLANS | OPTIONS & UPGRADES | HOME SPECS | CUSTOM | ENERGY STAR | FAQ's | MODULAR vs STICKBUILT | TEARDOWN AND REBUILD | GALLERY OF HOMES | MODULAR FOUNDATIONS | ABOUT US | CONTACT US

Newspaper

BLOG... ABOUT MODULAR HOMES:

Wednesday, March 31, 2010

South Amboy Project Continues...

The Rain continued to beat down on the South Amboy Project on Monday and Tuesday this week and all we could do was batten down the hatches and keep all the water from entering the units because the roofs were not up on many parts of the building as of yet.  Additional tarps were called for and installed on all open roof sections to accomplish this.  The good news is the sun is shining today and we are setting more boxes with the remainder to be set tomorrow.  From that point on the main mission over the next several days since no rain is expected is to get the roof up and the entire building water tight so we can start on any finish work in the interior. 

3:52 pm edt 

Friday, March 26, 2010

Very Busy Week at 3 Story Project
Over 40 boxes were set this week at the 3 story project in South Amboy despite the constant battle with the weather.  Rain and wind were a constant problem so mainly 1st and 2nd floor boxes were set this week with only part of one day to pull up and set some of the roof.  Hoping to work on the roof early next week.  Most of the Dormers are built and ready to be set once the roof is up.  Photos will be posted shortly.  Modular Construction is definitely the way of the future.  It has many applications.
7:22 pm edt 

Tuesday, March 23, 2010

Set Starts on 40,000 sq. ft.3 story modular building.
40 Unit 3 story building set started yesterday, Monday March 22.  Despite the rain we were able to get 8 boxes up successfully.  The Set Crew did a spectacular Job.  Today, despite the rain again we were able to get another 8 boxes up along with two third floor boxes and roof work.  We are all looking forward to a nice day tomorrow so we can get more third floor boxes on and get a large part of the roof pulled up and weather tight.  Stay Tuned!
9:04 pm edt 

Friday, March 19, 2010

Pheonix Home Receives 5+ star Energy Certification Rating

Recent Home in Hopatcong that was just completed received a 5+ rating from the Certified Energy Star rater.  Home was so tight the meter on the Blower Door test did not even register.  The rater was very impressed.  Duct Blaster Test also passed with flying colors, again such a low air leakage the meter did not register.  We and the homeowner are very pleased with this outcome.  The energy costs for this particular home will be much lower than a comparable non-energy star certified home and much better than a stick built home.

5:15 pm edt 

Friday, March 12, 2010

A quality Modular Home manufacturer utilizes many Green Friendly materials and processes to save energy, recycle materials and to manage waste in an environmentally responsible manner. Phoenix Custom Homes only deals with quality Modular Home manufacturers.
4:31 pm est 

Thursday, March 11, 2010

Green News - CFL Bulbs Are Now Dimmable!
Compact Fluorescent Bulbs could not be used in dimmer fixtures until now.  Philips Energy Saver dimmable compact fluorescents deliver reduced operation costs compared to incandescent equivalents.  They feature soft white light with excellent dimming performance when used with many standard household dimmers.  The can dim to 10% of full light.  The electronics and tube design optimize life and dimming performance, while the low end dimming limit prevents flickering with many standard household dimmers.  Now you can go green with "all" of your light fixtures in your entire home. 
5:40 pm est 

Tuesday, March 9, 2010

Energy Star Certification

New Home in Hopatcong passes Energy Star Blower Door Test and Duct Blaster Test with flying colors.  Waiting for Energy Star Certification Certificate.  Energy Star Homes are as much as 25% more energy Efficient than a non Energy Star Home.

11:28 pm est 

Monday, November 2, 2009

Robert Noble Project in South Amboy

Phoenix Custom Homes to Build a 40 Unit 3 Story Complex in S. Amboy set Date to be Announced.  Multiple Day Set - 56 Modules.  Don't miss this!

6:47 pm est 

2010.03.01 | 2009.11.01

Link to web log's RSS file

---------------------------------------------------------------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------
-----------------------------------

 


* CORPORATE OFFICE: 11 Benjamin Boulevard * Manahawkin * NJ * 078050
Phone: (732) 382-1234 Fax: (866) 403-0418


INFORMATION:  Phone: (862) 268-2259
Email:
info@phoenixcustomhomes.us


This site  The Web 

© Phoenix Custom Homes 2008